Vol. 3 No. 2 (2014): SEPTEMBER

This issue has been available online since 24 September 2014 for the regular issue of September 2014. All Articles in this issue were authored/co-authored by 13 Authors from One Universities (Universitas Ibn Khaldun Bogor).
Published:
2014-09-24
Artikel
-
MENGUKUR KINERJA KEUANGAN PERUSAHAAN DENGAN MENGGUNAKAN SISTEM DU PONT Tahun 2009 – Tahun 2013 (Studi Kasus PT United Tractors Tbk)
-
This article have been read 351 times, downloaded 2235 times PDF
-
-
PERANAN PENGAWASAN MUTU UNTUK MENINGKATKAN VOLUME PRODUKSI SEPATU PADA CV. WILDAN JAYA CIOMAS – BOGOR
-
This article have been read 341 times, downloaded 577 times PDF
-
-
PENGARUH PELAKSANAAN PROGRAM KESELAMATAN DAN KESEHATAN KERJA TERHADAP PRODUKTIVITAS KERJA KARYAWAN PADA CV ANEKA JASA MOTOR BOGOR
-
This article have been read 438 times, downloaded 603 times PDF
-
-
PENGARUH SALES PROMOTION TERHADAP PENINGKATAN JUMLAH NASABAH TABUNGAN PADA BANK TABUNGAN NEGARA (Persero) CABANG BOGOR
-
This article have been read 361 times, downloaded 363 times PDF
-
-
Pengaruh Motivasi Dan Disiplin Terhadap Produktivitas Kerja Karyawan Di Sekolah Alam Al-Giva Bogor
-
This article have been read 14 times, downloaded 17 times PDF
-