Journal History |
Editorial Board |
Review |
Focus and Scope |
Publication Ethics |
Author Guidelines |
Online Submissions |
Publication Fee |
Contact |
Vol. 7 No. 1 (2023)

This issue has been available online since February 6th, 2023, for the regular issue of February - July 2023. All Articles in this issue were authored/co-authored by 53 Authors from eight Universities (Universitas Muhammadiyah Aceh, Universitas Ibn Khaldun Bogor, Universitas Pembangunan Nasional Veteran Jawa Timur, Institut Teknologi Al-Kamal, Universitas Muhammadiyah Tasikmalaya, Universitas Pembangunan Jaya, Universitas Kadiri, and Universitas Bung Hatta).
Articles
-
Pemilihan Metode Pembayaran Menggunakan Termin dan Turnkey pada Proyek Kontruksi di Banda Aceh
-
This article have been read 508 times, downloaded 4179 times PDF (Bahasa Indonesia)
-
-
Analisis Stabilitas Dan Biaya Perencanaan Dinding Penahan Tanah Tipe Bronjong di Sungai Ciliwung (Studi Kasus: Ruas Legok Nyenang Rt.01/03, Desa Leuwimalang, Kecamatan Cisarua, Kabupaten Bogor)
-
This article have been read 880 times, downloaded 996 times PDF (Bahasa Indonesia)
-
-
Efektifitas Polisi Tidur (Road Humps) dalam Mereduksi Kecepatan pada Ruas Jalan H.M. Syarifudin di Kota Bogor
-
This article have been read 788 times, downloaded 950 times PDF (Bahasa Indonesia)
-
-
Pengolahan Air Limbah untuk Pemanfaatan Penyiraman Tanaman di Rumah Sakit Y Kabupaten Tuban
-
This article have been read 5633 times, downloaded 7980 times PDF (Bahasa Indonesia)
-
-
Perencanaan MCK dan Septic Tank Komunal di Desa Weninggalih, Kecamatan Jonggol, Kabupaten Bogor
-
This article have been read 613 times, downloaded 482 times PDF (Bahasa Indonesia)
-
-
Analisis Tebal Perkerasan Jalan dengan Metode AASHTO terhadap Kerusakan Ruas Jalan Cileungsi – Cinyongsong Udik, Kabupaten Bogor
-
This article have been read 762 times, downloaded 1439 times PDF (Bahasa Indonesia)
-
-
Multi-Criteria Analysis Method For Determining The Priority of Bridge Construction
-
This article have been read 171 times, downloaded 165 times PDF
-
-
Evaluasi Kinerja Angkutan Umum Trans Pakuan Trayek Terminal Bubulak via Cidangiang – Ciawi di Kota Bogor
-
This article have been read 1020 times, downloaded 889 times PDF (Bahasa Indonesia)
-
-
Perencanaan Sistem Drainase dengan Metode Sumur Resapan di Masjid Al Hijri II, Universitas Ibn Khaldun Bogor
-
This article have been read 703 times, downloaded 623 times PDF (Bahasa Indonesia)
-
-
Metode Pelaksanaan dan Analisa Efisiensi Pekerjaan Aluminium Formwork System pada Proyek Apartemen Sudimara Forestwalk Tower Albizia
-
This article have been read 435 times, downloaded 553 times PDF (Bahasa Indonesia)
-
-
Peningkatan Jalan Menggunakan Perkerasan Kaku (Rigid Pavement) pada Ruas Jalan Letnan Sukarna Kecamatan Ciampea Kabupaten Bogor
-
This article have been read 429 times, downloaded 347 times PDF (Bahasa Indonesia)
-
-
Penentuan Karakteristik Tanah Desa Ngasem dengan Metode ASTM
-
This article have been read 391 times, downloaded 332 times PDF (Bahasa Indonesia)
-
-
Transformasi Stadion Olah Raga KONI di Kawasan Perdagangan Kota Jambi
-
This article have been read 171 times, downloaded 185 times PDF (Bahasa Indonesia)
-
-
Perhitungan Kebutuhan Air Irigasi untuk Perluasan Daerah Irigasi (Studi Kasus: Daerah Irigasi Cisadeng II, Desa Leuwisadeng, Kecamatan Leuwisadeng, Kabupaten Bogor)
-
This article have been read 334 times, downloaded 969 times PDF (Bahasa Indonesia)
-
-
Efektifitas Pita Penggaduh (Rumble Strips) dalam Mereduksi Kecepatan pada Ruas Jalan Achmad Adnawijaya Kota Bogor
-
This article have been read 278 times, downloaded 292 times pdf (Bahasa Indonesia)
-